LandlordDates
Not legal advice. This is a free reference compiled from official government sources. Laws change and local details matter. Confirm every deadline with the official source or a licensed attorney before you rely on it.

Last verified: · Confidence: medium

What lead paint rules apply to landlords in Detroit?

Short answer

Pre-1978 rentals: every compliance inspection includes a lead paint visual assessment (plus dust wipes in high-risk areas)

When: Every 3 years from the certificate of compliance inspection

For Detroit rental inspections, all paint is presumed to be lead-based and deteriorated paint is a violation. Every inspection includes a visual assessment; in the city's high-risk lead areas it also includes dust wipe samples where state law allows. Violations must be fixed and re-inspected before the Certificate of Compliance is issued. Buildings completed after January 1, 1978, and fully abated or certified lead-free properties, are exempt from the lead portion.

"all paint on the interior or exterior of any residential rental property is presumed to be lead-based and any deteriorated paint in rental property is a deteriorated paint violation."
detroitmi.gov
"All inspections performed shall include a visual assessment."
detroitmi.gov
"Original construction on the rental property was completed after January 1, 1978"
detroitmi.gov

Source: detroitmi.gov · Last verified 2026-10-23 · Confidence: medium · Full rule details

Detroit, MI rules on this topic

Pre-1978 rentals: every compliance inspection includes a lead paint visual assessment (plus dust wipes in high-risk areas) Verified

Deadline: Every 3 years from the certificate of compliance inspection

For Detroit rental inspections, all paint is presumed to be lead-based and deteriorated paint is a violation. Every inspection includes a visual assessment; in the city's high-risk lead areas it also includes dust wipe samples where state law allows. Violations must be fixed and re-inspected before the Certificate of Compliance is issued. Buildings completed after January 1, 1978, and fully abated or certified lead-free properties, are exempt from the lead portion.

Applies to: any number of units, buildings built before 1978 · Layer: Detroit, MI · Topic: Lead paint disclosure and certifications

Who it covers: Rental property built before 1978 (original construction completed before January 1, 1978).

"all paint on the interior or exterior of any residential rental property is presumed to be lead-based and any deteriorated paint in rental property is a deteriorated paint violation."
detroitmi.gov
"All inspections performed shall include a visual assessment."
detroitmi.gov
"Original construction on the rental property was completed after January 1, 1978"
detroitmi.gov

Notes: Detroit City Code 8-15-82(d) and (f). Medium confidence: the official PDF shows inserted and struck-out wording, and the extracted text cannot always tell them apart. City Code Ch. 8, Art. XV, Div. 3, as amended by the rental ordinance passed Oct. 29, 2024 (official PDF posted by the City; text extracted without the margin line numbers).

Last verified 2026-10-23 · Confidence: medium · Status: verified · Report a correction

Federal lead disclosure rules that also apply

These apply to housing built before 1978 in every state, on top of the rules above.

Federal rules on this topic (all states)
RuleDeadlineConfidence
Lead-based paint disclosure and EPA pamphlet before lease signing (pre-1978 housing)Before the tenant is obligated under the lease (before signing / before accepting an offer to lease)high
Signed lead disclosure attachment with lease; keep for 3 yearsKeep the signed disclosure for at least 3 years from the lease start; the date shown is the earliest you may discard ithigh

Federal lead paint disclosure rules for landlords

Same topic in other places

More: Lead paint disclosure and certifications in every covered place · All Detroit, MI landlord rules · Build a dated calendar